Template

Home Renovation Budget Template

Plan a kitchen, bathroom or whole-home remodel. Track labor and materials, compare quotes and keep a contingency so the project stays on budget.

Updated November 19, 2026In Big Life CostsFree download: Excel, PDF

Please note: This page provides general tools and information, not financial advice. Consider speaking with a qualified professional about your situation.

Download this template free

No sign-up needed. Word and Excel files also open in Google Docs, Google Sheets and Apple Pages/Numbers. Letter size (8.5 × 11 in).

Home Renovation Budget

Project[e.g. Kitchen remodel]
Total budget$
Target finish date
Item / taskContractor / storeLaborMaterialsTotalPaid to dateStill owedStatus
Design / permits
Demolition and disposal
Plumbing
Electrical
Drywall and paint
Cabinets
Countertops
Flooring
Fixtures and hardware
Appliances
Lighting
Cleanup
Total
Contingency (15%)
Total with contingency

Preview of the template. Highlighted [brackets] show text to replace.

How to plan a renovation budget

  1. Define the scope. List every task, from permits and demolition to final cleanup.
  2. Get at least three quotes for each major trade. Use the same scope for each.
  3. Separate labor and materials. It makes quotes easier to compare and shows where you could save.
  4. Add a contingency of 15% (the template calculates it), or more for older homes.
  5. Track payments as you make them. The template shows what you still owe.
  6. Keep all receipts and contracts. Renovation costs that are capital improvements can reduce taxable gains when you sell your home.

Ways to save on a remodel

  • Keep the layout. Moving plumbing and walls is expensive.
  • Do the demolition or painting yourself if you are able.
  • Buy materials yourself if your contractor agrees, or ask for contractor discounts.
  • Shop surplus and reclaimed for cabinets, fixtures and lighting.
  • Avoid changes mid-project. Change orders are one of the main reasons projects go over budget.

Questions to ask contractors

  • Are you licensed and insured in this state? (Ask for proof.)
  • Will you pull the permits?
  • Who will be on site each day, and will you use subcontractors?
  • What is the payment schedule?
  • How do you handle change orders?
  • What warranty do you offer on your work?

Plan the schedule with our project plan template, and keep up with routine upkeep using the home maintenance schedule.

Frequently asked questions

How much contingency should I add to a renovation budget?

A contingency of 10% to 20% is standard. Use the higher end for older homes, where hidden problems such as outdated wiring, rot or plumbing issues are more likely.

How many contractor quotes should I get?

At least three for any significant job. Make sure each quote covers the same scope and materials so you can compare them fairly.

Do I need a permit for my renovation?

Structural, electrical, plumbing and many HVAC changes usually require permits from your city or county. Cosmetic work such as painting and flooring usually does not. Unpermitted work can cause problems with insurance and when you sell.

How should I pay a contractor?

Avoid paying large amounts up front. Some states limit deposits for home improvement contracts. Pay in stages tied to completed milestones, and keep the final payment until the work passes inspection and you are satisfied.

Related templates and guides